GREENHOU S E SGRANDIOGREENHOUSE USER MANUAL© 2013 Grandio Greenhouses, Backyard Living Source Inc. All rights reserved2015 Manual Edition Extendable G
BA-S2620603CL08D603D601B601B620604-R601A-FL601A-FR601B601B619L08D603C603E602C602D 602D601B601B601B601BL08B-X601A-BL08B603C603C601A-BL08B-X622622604-L6
BA-S2620603CL08D603D601B601B620604-R601A-FL601A-FR601B601B619L08D603C603E602C602D 602D601B601B601B601BL08B-X601A-BL08B603C603C601A-BL08B-X622622604-L6
BASE KIT ASSEMBLY INSTRUCTIONSPre-Plan The Placement Of Your Structure Allow enough room to get a wheel barrow in and around your structure. Be sure t
BA-S5BA-S6BA-C4BA-A1BA-S10BA-S03BA-M0346 3/4 in / 1187 mm46 3/4 in / 1187 mm 8 7/16 in / 214 mm9 13 /16 in / 250 mm1/2 x 3/4M6*14NUTGRAPHIC
BA-S3BA-S4BA-C4BA-A1BA-S10BA-S03BA-M0393 7/16 in / 2374 mm 93 7/16 in / 2374 mm8 7/16 in /214 mm9 13/16 in / 250 mm1/2 X 3/4M6*14NUT(GRA-BA-8X) BASE A
BA-S1BA-S2BA-S1BA-S2BA-C3BA-C3BA-C31.1 Layout all base kit pieces to prepare for assembly. Note that one BA-S1 will be at the front and one BA-S1 will
BA-S1BA-S2BA-S1BA-S2BA-C3BA-C3BA-S3BA-S4BA-C3BA-C41.3 Layout all base kit pieces to prepare for assembly. Note that one BA-S1 will be at the front and
BA-S1BA-S2BA-S1BA-S2BA-C3BA-C3BA-S3BA-S4BA-C3BA-C4BA-C3BA-A1BA-A1BA-A1BA-A1BA-A1BA-S5BA-S61.5 Layout all base kit pieces to prepare for assembly. Note
BA-S1BA-S2BA-S1BA-S2BA-C3BA-C3BA-S3BA-S4BA-C3BA-C4BA-C3BA-A1BA-A1BA-A1BA-A1BA-A1BA-A1BA-S4BA-S38x24 BASE KIT ASSEMBLY INSTRUCTIONS(GRA-BA-8) AND (GRA-
18STEP ONE1.9 Slide the BA-C3 into the BA-S1, slide the BA-S2 into the BA-C3, align the holes and push together to an even and tight position and use
GREENHOU S E SGRANDIOBefore you begin, take time to complete this check list. Take inventory of all parts using the parts list at the back of this man
OutdoorGround Assembly1.11 BA-A1 must be buried in ground. See .Dig holes to bury the BA-A1’s, you determine size and depth for your location. W
1.12 Holes are present in base kit for anchoring bolts see and . You determine and acquire proper fastener prior to installation for your
FRONT FRAME ASSEMBLY INSTRUCTIONSALWAYS ASSEMBLE FRONT HORIZONTALThis picture shows the inside view of front section fully assembled.All parts for fr
2.1 Prethread all S05 screws into the WG01 and WG02’s for ease of installation, see only turn S05 a few turns. 2.2 Use WG01 bracket to attach t
2.4 Insert polycarbonate panels Y3-2 and Y3-1 into place as shown in . 2.5 Attach 603E and 603D with W04 and S04/ML01 fasteners as shown i
2.7 View diagrams and attach the (2) 604’s and (2) 601A’s to the 619. Note the orientation of the 604’s, there are 4 dierent 601A’s (2) for the front
Polycarbonate panel606-WS619GRANDIOTIPTransparent FilmOutside GreenhouseOpal White FilmInside GreenhousePolycarbonate PanelSunInside ViewY1Y1604-L604-
2.12 Move roof and front section together and align the WG02’s into the 601A’s, and the W04-2’s into the 604’s. Insure a snug t between the WG02’s, 6
This image shows the inside view of the back wall assembly.All parts for back assembly will be found in box GRA-ELI-8A and GRA-ELI-8P. We recommend t
3.1 Prethread all S05 screws into the WG01 and WG02, see . 3.2 Use the WG01 bracket to attach the (2) 601B’s together, secure parts by sliding
IMPORTANT! SAFETY INSTRUCTIONSFAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID WARRANTY.To ensure safet
Y1Y1Y1Y1601A-B601A-BL08A602C602D 602D3.4 Attach (2) 601A-B’s to L08A using S04/ML01 fastener as shown in diagram .Attach (2) 602D’s to L08A usin
Y1Y1Y1Y1601A-B601A-B602C602D 602DY4-1Y5-1Y5-2Y4-23.7 Set (4) 603C’s atop each Y-1 panel, then align the pre threaded S04-ML01 fasteners in each 603C t
Inside View3.9 Pre thread the S05 screws on WG01, WG02’s and the S04/ML01 W04-2’s brackets and place into appropriate extrusion see ,
3.10 A. Attach (2) L08B-X’s to (2) 602D’s and L08A with S04/ML01 as shown in .B. Attach (2) L08B-X’s to the (2) 601A-B’s with fasteners as shown
1MIDDLE ASSEMBLY INSTRUCTIONS4.1 We recommend pre threading all (9) W05 clips with the nut and bolt combos now. See , note the bolt head will a
34STEP FOURMIDDLE ASSEMBLY CONTINUED601A601BL08A-XL08C-XL08DL08C-XBase4.3 Attach L08C-X to 601A and the BA-S2 with S04/ML01 on both sides as shown in
14.5 Have person (1) continue to hold the front vertically while the other attaches the font section to the base with W05/S04/ML01 fasteners as shown
MIDDLE ASSEMBLY CONTINUED4.6 Attach back wall 601A’s with back base corners using S04/ML01 on both sides as shown in .4.7 Attach bottom of L08C-
Repeat these steps if you are building an 8x20 or 8x24 with your last extension box, note it is best to connect 8x8, then 8X, then an 4X if assembling
MIDDLE ASSEMBLY CONTINUED607607601B601BInside ViewSide Angle View607601B601BInside ViewS04/ML014.11 With 2 people, attach the ridge to front and back
ASSEMBLY INSTRUCTION STEPSPREPARE FOR ASSEMBLYSTEP ONE: BASE ASSEMBLYSTEP TWO: FRONT ASSEMBLYSTEP THREE: BACK ASSEMBLYSTEP FOUR: MIDDLE ASSEMBLYSTEP
EXTENSION ASSEMBLY INSTRUCTIONSWarning: You will need a minimum of 2 people to complete this section, you will not be able to stop assembly until pag
L08M-XL08M-XW14 BRACKET5.1 Connect the (2) braces labeled L08M-X / L08C-X together with the nut and bolt combo S04/ML01 see . The combined L08M-
5.4 Attach the 609-XS to 609 with the (2) S09 screws provided see . The S09 screws are to be installed from the outside of the 609, see
5.5 With 2 people proceed to install 609 in this order, note that 609 must be installed with groove side down see . 1. With one person holding t
43STEP FIVE609609602ANOTE EXACT PLACEMENT OF THE 602A TO THE 609.EXACTPLACEMENT LINE FOR 602A4. Note the top of 602A should touch the line on the 609
44STEP FIVE5.6 Moving up to the midroof 609, with person 1 holding the 609 in place person 2 will attach the 609 to the front of the greenhouse to the
45STEP FIVE609609602B607609602ABZ-1AZ-1602AAZ-1AZ-1 BRACE(longer edge touches bottom of interior base kit)125.8 With two people attach the AZ-1 to th
15.10 Connect the (2) braces labeled L08M-X / L08C-X together with the nut and bolt combo S04/ML01 see . The combined L08M-X’s should measure ab
5.13 Attach the 609-X to 609 with the (2) S09 screws provided see . The S09 screws are to be installed from the outside of the 609, see
11609-XS609609-XS609609-XS2609609S09609-XSGAP FOR SCREWS609-XS5.14 With 2 people proceed to install 609 extension at the eave or lower mid roof in thi
PREPARE FOR GREENHOUSE ASSEMBLY48X12 GRANDIO ELITE BARN STYLE GREENHOUSE DIMENSIONSROOF PEAK HEIGHT 1 3/4” GUTTERS 61”EAVE HEIGHTDOOR HEIGHT97.5”44”1
1609125.15 With person 1 holding the 609 in place person 2 will attach the 609 to the 609-XS with the (2) S09’s screws to the upper mid roof see
2602AAZ-1AZ1 BRACE(longer edge touches bottom of interior base kit)5.17 With two people attach the AZ-1 to the base and the lower 602A, see .
226096076091602A609609-XSML01/S046095.19 With two people attach the 609 extension to 609-XS with the (2) S09 screws provided see and .5
5.21 Before you attach the 602A’s to the sides of the greenhouse you will need to loosen the ML01 (nut) attached to the L08C-X and the base. See diagr
5.22 Install only the upper roof line 602B’s between the 607 and the 609 along the entire upper roof line with S04/ML01 (nut and bolt). See and
5.23 Insert Y11 panels to upper roof section then slide the 630 into the groove of the upper 609 as shown to hold Y11’s in place. See and
SUN616615PC sheet5.24 Assemble the roof window vents as shown below in and , using the Z02 screws attach the 615, 616, and 618’s with th
602BY10Y10Polycarbonate Panel606BASEOutside5.26 Attach all remaining 602B’s between the 609’s, after all roof vents are positioned see .5.27 Ins
5.29 To ensure there is no gap in roof vent position 603C as shown in . Connect 603C to middle of 602B’s using W04 bracket as shown in .
Y10Y10Y11Y11Y11Y11Y115.31 Remove the L08M-X support combo, take apart and use as L08C-X now and install on the sides of the AZ1 extension brace, as sh
EXTENSION KIT BOX CONFIGURATIONSGRA-ELI-8PElite 8’x8’GRA-ELI-8A+Aluminum Extrusions, Hardware Bag, Front, Back and Doors. 8x8 Base KitGRA-BAS-8Polyca
59STEP FIVEDP02BDP026106105.34 Apply a small amount of the silicone caulk to the seam where the 610 gutters meet, then attach the DP02 on the inside o
5.34 Attach JG01, JG02A, JG02B, JG03A and JG03B end caps to the ridge, midroof and gutters on both front and back as shown below. Squeeze a small amou
DOOR ASSEMBLY DIAGRAMZ01622Y6Y6622-RUPUPDoubleBall Catch 620Z01Z01Z01Z01Z01623B623A622Side View622J08ABottomView623B620623AJ08AJ08A622-RUPUPSide View6
623B623A622J08ABottomViewJ08AWe recommend you lay out all parts for both doors to make sure they match up correctly for hanging. Double check the orie
J08A622J08ABottomViewSide ViewOf Top* DoubleBall Catch on the 622-L 622-LUPUPSide ViewOf Bottom6.4 Insert J08A into the bottom of the 622-R and 622-L,
DOOR INSTALLATION64STEP SIXS02L21603D6.7 Slide the (2) S02 bolts down the track of the L21 see , align with the holes on the 603D door header. W
S04S04S026.8 Separately slide the top of the doors in the left and right side of L21, see diagram , until they latch in the middle. 6.9 Attach t
6.10 Attach L28 to L21 with S04/ML01, and L28 to 601A with S02/ML01 as shown below in diagram and . Check that the L21 and L28’s are sq
INTERIOR ROOF SUPPORT ASSEMBLY 7.1 Attach the L08E-X to the upper roof section as shown with S04/ML01 fasteners already in place where the 607 meets
68PARTS LIST FOR GRA-ELI-8A601A-B601A-FL601A-FR601B602A602B602C602D-R602D-L603C603D603E619 PACKTHRESHOLD BARAND SCREW604-R 604-L607606-WS6096106156166
BACKFRONT620LEFT SIDE RIGHT SIDE6603CL08D603D601B601B620604-R601A-FL601A-FR601B601B619L08D603C603E602C602D 602D601B601B 601B601BL08B-X601A-BL08B603C60
L08DL08A-XL08B-XL08C-XL08D-XL08E-XWG01WG02W04W04-1W04-2Z01Z0224 3/16 in / 614 mm52 1/4 in / 1327 mm51 3/16 in / 1300 mm61 1/32 in / 1550 mm37 13/16 in
10622-HNDL622-HNDLNUT/BOLT620L21J07622622-L622-R623A623BJ08AGRAPHIC PART NAME SIZE/LOCATION QUANTITY44212211224DOOR HANDLESD
71PARTS LIST FOR GRA-ELI-8P(GRA-ELI-8P) 8’x8’ ELITE PANEL BOX PACKING LISTY1Y2-1Y2-2Y3-1Y3-2Y4-1Y4-2Y5-1Y5-2Y6Y7Y8Y9Y10Y11FRONT & BACK PANELFRONT
602A602B603CL08C-X / L08M-XL08D-XL08E-X607607-XSDP01609609-XSDP03606-WS610DP02DP02B630615616618AZ-1, S02/ML01BZ-1CZ-1Z02S04 / ML01S0656 9/16 in / 1437
S07S08S09W04W14W15HQC01HQC02Z04, S04/ML01M5*8SCREW FOR DP02 AND DP02BM6*16ATTACHES 607-XS TO 607M4*6ATTACHES 609-XS TO 609CONNECTOR FOR 603CL08M-X BRA
74PARTS LIST FOR GRA-ELI-4X4X ELITE 4’ EXTENSION PANEL BOX PACKING LISTY7Y8Y9Y10Y11SIDE WALL PANELROOF PANELUNDER ROOF VENTROOF VENT PANELROOF PANELGR
602A602B603CL08C-X / L08M-XL08D-XL08E-X607607-XSDP01609609-XSDP03606-WS610DP02DP02B630615616618AZ-1BZ-1CZ-1Z02S04 / ML01S0656 9/16 in / 1437 mm29 7/16
S07S08S09W04W14W15HQC01HQC02Z04, S04/ML01 M5*8SCREW FOR DP02 AND DP02BM6*16ATTACHES 607-XS TO 607M4*6ATTACHES 609-XS TO 609CONNECTOR FOR 603CL08M-X BR
601A-B601A-FL601A-FR601B602A602B602C602D-R602D-L603C603D603E619 PACKTHRESHOLD BARAND SCREW77PARTS LIST FOR GRA-ELI-8XP(GRA-ELI-8XP) GRANDIO ELITE 8 EX
24 3/16 in / 614 mm52 1/4 in / 1327 mm51 3/16 in / 1300 mm61 1/32 in / 1550 mm37 13/16 in / 960 mm38 11/16 in / 957 mmFRONT & BACKFRONT & BACK
7BA-S2BACKIn boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all in GRA-BAS-8. FRONTIn boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all i
Grandio Greenhouse Limited Lifetime Warranty1. Grandio Greenhouses are warranted to the original purchaser to be free from defects in material or work
NOTES NOTES
GREENHOU S E SGRANDIOGREENHOUSE USER MANUALKEEP IN A SAFE PLACE FOR REFERENCECONTACT US IF YOU NEED HELPORHAVE MISSING OR DAMAGED PARTSGRANDIOGREENHOU
BA-S2606-WS620603CL08D603D601B601B620604-R601A-FL601A-FR601B601B619L08D603C603E602C602D 602D601B601B601B601B601A-BL08B603C603C601A-B622622604-L602A602
Kommentare zu diesen Handbüchern